In December Rodgers Marine Contracting Received a call from a vessel which was stranded in NSW following a lightning strike.
Upon inspection We found all the vessels electronics, Refrigeration and LED navigation lighting and charging systems where damaged beyond repair.
We carried out a full new Furuno/Garmin Electronics package/Aquasignal LED Navigation lighting and Refrigeration module installation including Silentwind wind Generator system.
We completed the job for the client and his insurer on time and on budget.
The vessel is now continuing its voyage north with a full up to date GPS/Radar/Wind system/Depth transducers/Autopilot/FI-50 instruments and Silentwind wind turbine system.